Commissioning mission critical facilities.

With precision, performance, and reliability.

At 2N Mission Critical, we deliver specialized design and commissioning services for electrical and mechanical systems supporting hyperscale data centers and other mission critical facilities, complemented by QA/QC solutions that ensure peak reliability and performance from construction through handover.

2N engineers commissioning switchgear on site

2N topology, both paths energised

Either path carries the full load alone

Rows of server cabinets in a data hall

ACG member firm

2N Mission Critical Corp is a listed member firm of the AABC Commissioning Group, the certifying body for independent commissioning authorities.

ACG US member directory

CxA certified

Freddy A. Lee is listed in the ACG directory as a Certified Commissioning Authority (CxA), the credential owner specifications commonly require of a commissioning provider.

ACG US member directory

Independent of design and install

We are engaged by the owner and we install nothing. With no equipment line, no installation arm and no design fee involved, our verification carries no conflict of interest.

DIN rail terminals and field wiring in a control panel

What we verify

Every termination, every sequence, every failure mode, documented.

Scope

Electrical and mechanical
commissioning.

Both disciplines are delivered by a single commissioning authority, so the power path and the cooling path are verified against one coordinated plan.

Electrical terminals and field wiring

Electrical

Power path

Verifying, testing and documenting the performance of electrical systems and components before they are placed in service.

Electrical systems are verified end to end, under load, and across the failure modes they are designed to withstand, before the facility is placed in service.

  • Utility service and switchgear
  • Generators and paralleling controls
  • Automatic transfer switches
  • UPS systems and battery plant
  • PDUs, RPPs and busway
  • Protective relaying and breaker settings
  • Grounding and bonding
  • EPMS integration and alarm verification
Overhead ductwork and air distribution

Mechanical

Cooling path

Verifying, testing and documenting the performance of mechanical systems and components before they are placed in service.

Cooling capacity, control response and failover behavior are verified while deficiencies can still be corrected without impacting the schedule.

  • Chillers and chilled water plant
  • CRAH, CRAC and fanwall units
  • Pumps, primary and secondary loops
  • Economizers and free cooling
  • Containment and airflow verification
  • Plumbing and pumping systems
  • Fire protection systems
  • BMS integration and sequence verification
Approach

The commissioning
process.

A systematic, quality-focused process that ensures building systems are designed, installed, tested, operated and maintained according to the owner's project requirements and the design intent.

  1. LEVEL0

    Pre-Design and Planning

    Establishing project goals, scope, roles and the Owner’s Project Requirements before design begins.

    • Establish project goals
    • Define scope and commissioning plan
    • Assign roles and responsibilities
    • Develop the Owner's Project Requirements (OPR)
  2. LEVEL1

    Design Phase

    Reviewing the design for compliance with the OPR and developing the commissioning specifications and test scripts.

    • Review design documents for compliance with the OPR
    • Provide design feedback and comment resolution
    • Develop initial commissioning specifications
    • Draft the test scripts the project will be held to
  3. LEVEL2

    Construction and Installation

    Confirming through submittal review and site observation that systems are installed as designed.

    • Review submittals and shop drawings
    • Conduct site observations
    • Confirm systems are installed as designed
    • Maintain the issues log from first observation
  4. LEVEL3

    Pre-Functional Testing

    Inspections and static tests confirming equipment is correctly installed, labeled, powered and ready for functional testing.

    • Perform inspections and static tests
    • Verify equipment is installed correctly
    • Confirm labelling and terminations
    • Confirm equipment is powered and ready for functional testing
  5. LEVEL4

    Functional Performance Testing

    Testing sequences of operation, control system response and alarms under simulated operating scenarios.

    • Simulate system operation under multiple scenarios
    • Test sequences of operation
    • Verify control system response
    • Verify alarms and annunciation
  6. LEVEL5

    Integrated Systems Testing

    Final verification of all systems operating together, including failure and recovery, followed by training and turnover.

    • Final verification of entire systems working together
    • Failure mode and recovery testing
    • Training for operations staff
    • Turnover to operations
Server rack rail detail

Level 5

Everything running together, at load, with something deliberately going wrong.

Why 2N

Why choose 2N.

A commissioning authority is engaged to provide the owner with an independent, documented verification of the facility.

Principal level involvement

Both founders are directly involved in the projects we commission. The engineers reviewing your submittals and witnessing your tests are the engineers whose names are on the firm.

Independent of design and construction

As a commissioning authority engaged by the owner, we hold no equipment line, no installation arm and no design fee. Findings are reported without a conflict of interest.

Documented at every stage

Each phase produces a record: the commissioning plan, test scripts, issues log, results and the turnover documentation. The documentation is the deliverable.

Industrial air handling units
Server rear, fan modules and cabling
Markets

Where downtime is
not an option.

Commissioning ensures continuous power, cooling and control, safeguarding operations where downtime is not an option.

Confidence from day one

Commissioning confirms that systems meet design intent, industry standards and client requirements, delivering confidence and peak performance from day one.

Hidden failures, found early

By thoroughly testing every component, commissioning identifies and corrects hidden failures before they impact critical infrastructure.

Risk, validated down

Mission critical commissioning minimises operational and financial risk by validating that all systems function under real-world and worst-case conditions.

Rows of server cabinets in a data hall

Hyperscale data centers

The primary focus of the practice.

Server rack rail detail

Colocation facilities

Multi-tenant critical environments.

Industrial air handling units

Hospitals

Where continuous systems are life safety.

Server rear, fan modules and cabling

Call centers

Continuous communication systems.

Electrical terminals and field wiring

Stock exchanges

Where an outage is measured in transactions.

Overhead ductwork and air distribution

Flight control towers

Continuous communication and computer systems.

The case

Why commissioning matters

Published industry data is consistent year over year, and it points to the systems commissioning exists to verify.

54%

of operators said power was the primary cause of their most recent impactful data center outage, the single largest category.

Uptime Institute Global Data Center Survey 2024, n=97

80%

said that outage would have been preventable with better management, processes or configuration.

Uptime Institute Global Data Center Survey 2024, n=97

57%

said their most recent major outage cost more than 100,000 dollars. One in five said it cost more than a million.

Uptime Institute Annual Outage Analysis 2026, reporting the 2025 survey

Uptime Institute's 2026 analysis identifies UPS systems, transfer switches and generators as the dominant failure points. These are the systems we verify, under load, across the failure modes they are designed to withstand.

Home market

Our home market

2N Mission Critical is based in Atlanta, currently the fastest growing data center construction market in North America.

2,882 MW

under construction in Atlanta, H1 2026, up 52.3% year over year

CBRE North America Data Center Trends H1 2026

No. 1

Atlanta overtook Northern Virginia as North America's top market for total data center construction for the first time in H1 2026

CBRE, H1 2026. Ranking is by capacity under construction

1%

Atlanta vacancy rate as the market ended March 2026

CBRE, reported by the Atlanta Journal-Constitution, June 2026

9,885 MW

of new energy approved for Georgia Power in December 2025, around 80% of it expected to serve data centers

Georgia Public Service Commission

Figures above are published by the named third parties and describe the Atlanta market, not 2N Mission Critical's portfolio.

Start here

Let us know about your project and the schedule it has to meet.