Our market

Where downtime is not an option.

Commissioning ensures continuous power, cooling and control, safeguarding operations where downtime is not an option.

2N engineers commissioning switchgear on site

Our market

Data centers first, and every other room where continuous power decides the outcome.

Sectors

Industries we serve.

Data centers are the primary focus of our practice. The same discipline applies wherever continuous power, cooling and control are essential to operations.

Hyperscale data centers

The primary focus of the practice.

Colocation facilities

Multi-tenant critical environments.

Hospitals

Where continuous systems are life safety.

Call centers

Continuous communication systems.

Stock exchanges

Where an outage is measured in transactions.

Flight control towers

Continuous communication and computer systems.

Why it matters

What commissioning delivers.

Confidence from day one

Commissioning confirms that systems meet design intent, industry standards and client requirements, delivering confidence and peak performance from day one.

Hidden failures, found early

By thoroughly testing every component, commissioning identifies and corrects hidden failures before they impact critical infrastructure.

Risk, driven down

Mission critical commissioning minimizes operational and financial risk by validating that all systems function under real-world and worst-case conditions.

Server rear, fan modules and cabling

Why it matters

Four in five operators said their last major outage was preventable.

The case

Why commissioning matters

Published industry data is consistent year over year, and it points to the systems commissioning exists to verify.

54%

of operators said power was the primary cause of their most recent impactful data center outage, the single largest category.

Uptime Institute Global Data Center Survey 2024, n=97

80%

said that outage would have been preventable with better management, processes or configuration.

Uptime Institute Global Data Center Survey 2024, n=97

57%

said their most recent major outage cost more than $100,000. One in five said it cost more than $1 million.

Uptime Institute Annual Outage Analysis 2026, reporting the 2025 survey

Uptime Institute's 2026 analysis identifies UPS systems, transfer switches and generators as the dominant failure points. These are the systems we verify, under load, across the failure modes they are designed to withstand.

Cabinet rail and cable management detail

Home market

Atlanta is the fastest growing data center construction market in North America.

Home market

Our home market

2N Mission Critical is based in Atlanta, currently the fastest growing data center construction market in North America.

2,882 MW

under construction in Atlanta, H1 2026, up 52.3% year over year

CBRE North America Data Center Trends H1 2026

No. 1

Atlanta overtook Northern Virginia as North America's top market for total data center construction for the first time in H1 2026

CBRE, H1 2026. Ranking is by capacity under construction

1%

Atlanta vacancy rate as the market ended March 2026

CBRE, reported by the Atlanta Journal-Constitution, June 2026

9,885 MW

of new energy approved for Georgia Power in December 2025, around 80% of it expected to serve data centers

Georgia Public Service Commission

Figures above are published by the named third parties and describe the Atlanta market, not 2N Mission Critical's portfolio.

Reach

Deployable worldwide.

Our engineers are highly trained and capable of deploying anywhere in the world to meet client needs.

Building in Atlanta or anywhere else, we would like to hear about it.

Start a project